TECHi's Analysis
73 wordsThe power shortages, brown-outs, and rolling blackouts that have long plagued Los Angeles county during times of peak energy usage may soon be a thing of the past now that the region’s energy utility has signed on with battery-maker AES Southland to install a massive, 400MW auxiliary power solution. Currently, when peak energy demand outstrips production in Los Angeles, Southern California Edison has to turn on a series of “gas peaker” plants.